    Sloped Yard Earthworks & Turf Preparation - Bardon

    Back to Case Studies

    Project Details

    Sloped Yard Earthworks & Turf Preparation
    Bardon
    Date of Job: 09 11 2026 – 11 11 2026

    Job Summary

    A difficult earthmoving and turf-preparation project on a sloped Bardon property. IRB prepared approximately 300m² of yard, working around the existing trees and site features to create an even surface ready for turf installation.
    The two-person team used narrow-access machinery to relocate approximately 30m³ of existing soil from the front of the property to the rear, a distance of approximately 50 metres. The sloping ground and access constraints made moving and distributing the soil a key part of the task.
    Works included:
    •Clearing remaining weeds, vines and vegetation, with green waste stockpiled onsite.
    •Smoothing and levelling existing ground, including previously disturbed areas and pathways.
    •Spreading and grading the relocated soil across the designated turf area.
    •Building up and levelling nominated areas using existing soil.
    •Final raking and surface preparation for an even finish ready for turf.
    The photographs show the prepared yard and matched before-and-after views of the earthworks. This project covered site preparation only: turf supply and installation, additional imported soil or fill, offsite waste disposal and structural retaining works were excluded.

    Scope of Work

    1/1 completed

    Landscaping/Turf Preparation

    1/1
    • Site preparation and earthworks across approximately 300 m² in preparation for turf installation.

      Scope includes:
      •Clearing remaining weeds, vines and vegetation, with green waste stockpiled onsite.
      •Smoothing and levelling existing ground, including previously disturbed areas and pathways.
      •Relocating approximately 30 m³ of existing soil from the front of the property to the rear (approximately 50 m), using narrow-access machinery.
      •Spreading and grading relocated soil evenly across the designated turf area.
      •Building up and levelling nominated areas using existing soil.
      •Final raking and surface preparation to provide an even finish ready for turf installation.
      Includes two-person labour, machinery hire and associated equipment.
      Exclusions: Turf supply and installation, additional imported soil or fill, offsite waste disposal and any structural retaining works.

    Matched Before & After Shots

    Before
    After
    Before
    After
    Before
    After
    Before
    After
    Before
    After

    Evidence Photos

    After

    3

    QA Approval

    QA Approved - all work reviewed and signed off by IRB Property Services.
    IRB Property Services Pty Ltd · ABN 64 702 552 743 · ACN 702 552 743 · 07 3608 1314 · info@irbpropertyservices.com.au