Project Details
Completed for: Homeowner
Deck Repainting & Pressure Washing
Brisbane South
Date of Job: 20 07 2026 – 21 07 2026
Job Summary
Job Summary
The rear timber deck was fully prepared and finished with a premium paint system, and the concrete pathways were pressure washed and chemically treated to remove built-up grime and organic growth. Works were completed within the allocated two-day schedule despite intermittent light showers, with all painted surfaces properly prepared and given sufficient drying time before the brief rain event — no impact to the final coating finish.
Scope of Work
2/2 completedCompleted Works
2/2Rear Timber Deck Preparation & Premium Paint Finish
Soft wash and chemically treat the timber deck, stairs, handrails and balustrades to remove mould, algae and organic growth.•Lightly sand and prepare the decking area only for painting (including visible decking base - as per client email/photo). This includes ensuring full masking and protection of adjoining areas to ensure no deck paint get on other surfaces.•Apply one full coat of Cabot's Brown Timbercolour Deck & Exterior Paint to the deck floor. Includes final touch-ups and quality inspection.•Apply one full coat of Old School colour paint (client supplied, under the house) to the visible decking base - as per client email/photoConcrete Pathway Pressure Washing & Chemical Treatment
Chemical treatment and pressure washing of all pathways, steps, adjoining concrete surfaces to remove dirt, mould and organic staining. Includes edge detailing, final rinse and presentation clean.
Before & After Photos
Rear Timber Deck Preparation & Premium Paint Finish
Before
After
Before
After
Before
After
Before
After
Before
After
Concrete Pathway Pressure Washing & Chemical Treatment
Before
After
Before
After
Before
After
Before
After
Before
After
Before
After
QA Approval
QA Approved - all work reviewed and signed off by IRB Property Services.
